This project consisted of the design and construction of a 1000 ft westerly extension of Kendall Tamiami Airport Runway 9R / 27L and parallel Taxiway “E” with a new Taxiway Connector. The scope of work included a new drainage pipe system and a swale conveyance system bordering the Taxiway on the north and the runway on the south and all associated Navigational Aids (ILS Localizer & Approach Lighting System, Glide Slope etc.). This runway extension is the first one performed within the last fifteen years in Florida. The new extension provides a safer runway for corporate jets and is expected to increase the airport revenue.

CSA was responsible for all the engineering and design for the runway and taxiway pavements, grading and for the drainage systems (piped or conveyance). An additional Construction Inspection services contract was also awarded to CSA.

Featured Projects

Previous Next