Commercial

Univision HD Studios “E” and “F”

Univision HD Studios “E” and “F” photo
Client:

Lemartec Engineering & Construction

Owner:

Univision

Location:

Doral, Florida

Cost:

$6.5 Million

Services:

Architecture

Engineering

Construction Administration

The scope of work consisted of the development of approximately ½ of an acre footprint adjacent to the North side of the existing Univision Broadcasting Center. The new facility incorporated two HD studios: a large Studio “E” consisting of 15,000 ft2 and a small Studio “F” consisting of 5,000 ft2. The new facility contains support spaces including audience holding area, audience lobby, private green rooms, make-up rooms, single-user restrooms, offices and conference room. The new facility was designed to provide hurricane protection for ratings of high category 3 to low category 4 hurricanes. The construction work was executed in a fully occupied facility requiring strategic phasing plan as part of the design.

Featured Projects

Previous Next